Create a Website Account - Manage notification subscriptions, save form progress and more.
Snow must be shoveled from public walks adjacent to your property within 24 hours of a snowfall. Failure to do so may result in the City removing your snow/ice and billing you.
Driveway aprons (from curb to sidewalk) shall be surfaced with 6 inches of concrete or with 2 inches of asphalt over a 6 inches gravel or crushed stone base.